We headed away for the weekend but PD were busy and installed all of the external doors and internal slide door cavities. (These are obviously not our chosen doors, they just use these to get to lock up stage)
Saturday, November 29, 2014
Doors
Saturday 29th November
We headed away for the weekend but PD were busy and installed all of the external doors and internal slide door cavities. (These are obviously not our chosen doors, they just use these to get to lock up stage)
We headed away for the weekend but PD were busy and installed all of the external doors and internal slide door cavities. (These are obviously not our chosen doors, they just use these to get to lock up stage)
Thursday, November 27, 2014
Bricks Day 4 - Pillars
Friday 28th November
The brick pillars at the entrance were done today. Also some doors were delivered.
Bricks Day 3 + Shower Bases
Thursday 27th November
The bricks continued at the the back of the house today. It's bricked up to almost 2 meters high now.
The waterproofers were also in and have complete the shower bases in the ensuite and main bathroom
No photos but Gippsland Solar have also roughed in their cables! Thanks Mum!
The bricks continued at the the back of the house today. It's bricked up to almost 2 meters high now.
The waterproofers were also in and have complete the shower bases in the ensuite and main bathroom
No photos but Gippsland Solar have also roughed in their cables! Thanks Mum!
Wednesday, November 26, 2014
Bricks Day 2 + Upstairs Carpentry Works
Wednesday 26th November
More bricks....
They have installed the bath structures and some more framing works up stairs.
More bricks....
They have installed the bath structures and some more framing works up stairs.
Tuesday, November 25, 2014
Brick Started, Entire House Wrapped & Solar Hot Water Installed
Tradesman didn't down tools until after 7pm tonight, which is fantastic, but we just wanted them to leave so we could take a look at the first lot of bricks laid! Really happy with our choice, assume it will look even better when mortar dries and bricks are clean.
The 1st floor has now been wrapped.
The plumber has roughed in upstairs, including the hot water solar panel.
Photos inside.
Monday, November 24, 2014
Ground Floor Wrapped
Monday 24th November
It was a terrible weather day here and we didn't expect any action on the house today..... but the ground floor has been wrapped with insulation and some more scaffold erected.
It was a terrible weather day here and we didn't expect any action on the house today..... but the ground floor has been wrapped with insulation and some more scaffold erected.
Saturday, November 22, 2014
Windows & Door Frames
Saturday 22nd November
All of the 1st floor windows and door frames have now been installed. It's really starting to come together. So far, so good!! Getting nervous about seeing the bricks go up..hopefully we've got the colour choice right...
All of the 1st floor windows and door frames have now been installed. It's really starting to come together. So far, so good!! Getting nervous about seeing the bricks go up..hopefully we've got the colour choice right...
Thursday, November 20, 2014
Bricks Delivered
Friday 21st November
The bricks have been delivered - we can't wait to see them installed. We chose them from a small 3 brick sample so hopefully they will look Just as good on a large scale!
The bricks have been delivered - we can't wait to see them installed. We chose them from a small 3 brick sample so hopefully they will look Just as good on a large scale!
Monday, November 17, 2014
Subscribe to:
Posts (Atom)