Saturday 17th October
We starting planting the some shrubs in the garden this weekend.
Allison chose some Leucadendrons of various color to plant down the fence line. Hopefully they will survive!
Before:
After:
Saturday, October 17, 2015
Friday, September 18, 2015
Grass
Friday 18th September
After months of dirt, dust and mud we finally got around to installing grass.
We hand spread 6m3 of top soil and laid 200m2 of Santa Ana Couch Grass.
It was a family effort!
After months of dirt, dust and mud we finally got around to installing grass.
We hand spread 6m3 of top soil and laid 200m2 of Santa Ana Couch Grass.
It was a family effort!
Thursday, September 10, 2015
Pool Fence
Thursday 10th September
We had to get a section of the deck completed before we could get the pool fence installed.
Perfect Pool Fencing installed glass around the pool visible from the house and aluminum down the side.
As there was a retailing wall they also had to face mount a piece of glass.
We had to get a section of the deck completed before we could get the pool fence installed.
Perfect Pool Fencing installed glass around the pool visible from the house and aluminum down the side.
As there was a retailing wall they also had to face mount a piece of glass.
Monday, July 27, 2015
The Deck
Monday 27th July
With the help of David Barber again we started the next mission..... the DECK!
We chose to use Australian Blackbutt Decking
Dave helped us for a few weeks and got the base structure in and a portion decked. We've been slowly decking ever since!
Stage 1 - Alfresco & Pool Area
Stage 2 - Front side of house to garage and bin enclosure
Stage 3 - Back side of house to laundry door
We are now mid way through October and we still haven't finished STAGE 1.
More photos to follow....
With the help of David Barber again we started the next mission..... the DECK!
We chose to use Australian Blackbutt Decking
Dave helped us for a few weeks and got the base structure in and a portion decked. We've been slowly decking ever since!
Stage 1 - Alfresco & Pool Area
Stage 2 - Front side of house to garage and bin enclosure
Stage 3 - Back side of house to laundry door
We are now mid way through October and we still haven't finished STAGE 1.
More photos to follow....
Monday, July 6, 2015
Fence
Monday 6th July 2015
The fence was installed today. Gates to follow in a week or so.
Finally some privacy!
The fence was installed today. Gates to follow in a week or so.
Finally some privacy!
Tuesday, June 16, 2015
Pool Complete
Monday, June 1, 2015
Friday, May 22, 2015
Shutters
Wednesday 20th May
Our shutters got installed today and they look fantastic! Bayside peninsula shutters and blinds did a fantastic job. James and his wife were great to deal with through the whole process. http://www.baysidepeninsulashuttersandblinds.com.au
Thursday, May 21, 2015